|
|
|
Engineering and AKKA Benelux's technical assistance concept is harnessed
to ensure its clients receive highly skilled supports.
Its several centers of expertise and a range of partnerships mean that AKKA Benelux can contribute to every development stage of an industrial project, from conception to installation, on a permanent or one-off basis. All internal projects are handled by a two-person team. The project manager deals with general and contractual matters, while the project leader deals with technical matters. AKKA Benelux can take charge of the follow-up and overall management of the project on behalf of its clients until the equipment has been installed and brought into service.
UGV fixture for aerostructure
Boring and taping machine: concept
Boring and taping machine: reality |
Tooling Analysis, preliminary studies, design definitions, studies and drawing up of fabrication files, production files and related CAD and NC files.In addition skills in the use of the most popular CAD packages such as Catia, ProEngineer,SolidWorks, and Autocad create a synergy between AKKA Benelux and its cusomers in the area of CAD. - Assembly jigs - Welding jigs - Fixtures - Automated and flexible toolings MACHINES AND TESTBEDS Conducting analyses, preliminary studies, design definitions and studies; drawing up fabrication files, production files and related CAD and NC files.In addition, its expertise in the use of the most popular CAD packages, including Catia, ProEngineer, SolidWorks and Autocad, creates synergy between AKKA Benelux and its clients in CAD - Special machines - Hydraulics, pneumatics & automation - Re-engineering of production lines - Development of testbeds
Assembly tooling for aeronautic landing gear
Fixture for hydraulic valves
Test bed (250T) Aircraft engine part |
|
Copyright AKKA Benelux - © 2010 -webmaster |